First day of prep work for Untitled (Basin and Range)

With the arrival of the wood and my team in place, we got to work preparing for the installation. We extended the 12 foot long pieces of lumber into 24 and 36 foot long pieces. Henry is sawing the wood to create joints which Helena and Dianna are gluing the joints together while Logan applies additional screws for safety.
Moca Tucson preps for Untitled Basin and Range

Henry Kerr at Moca Tucson

Helena Hill and Dianna Bynum

Logan Gonzales

First day of prep work for Untitled (Basin and Range)

Introducing the Basin and Range Crew

I am very excited to be working with a great crew at MOCA Tucson for Untitled (Basin and Range). Here is the crew enjoying a much deserved break (also known as “beer o’clock”) – Helena Hill, Logan Gonzales, Henry Kerr, and Dianna Bynun. Cheers to you for all your assistance thus far and in the coming weeks!

Basin and Range Crew

Introducing the Basin and Range Crew